CME Meeting 2011

From SCECpedia
Revision as of 23:50, 6 September 2011 by Maechlin (talk | contribs)
Jump to navigationJump to search

SCEC/CME Computational Science Planning Meeting 2011

Fig 1: Twenty one seconds after origin time for the SCEC M8 simulation showing instantaneous velocity magnitude as exaggerated topography. Image shows formation of a Mach cone at the leading of the M8 rupture as it progresses south at supershear velocity on Southern San Andreas Fault. (Image Credit: Amit Chourasia (SDSC), Yifeng Cui (SDSC), Kim Olsen (SDSU)
  • Organizers: T. H. Jordan, P. Maechling
  • Date: Sunday, September 11, 2011 (1:00pm – 3:30pm)
  • Location: Hilton Palm Springs Resort, Palm Springs, CA
  • Address: 400 East Tahquitz Canyon Way, Palm Springs, CA,92262-6605
  • Room: Oasis Room III (3rd Floor)

SCEC/CME Meeting Agenda Sept 11, 2011

Meeting Format: Researchers and research groups present their current and planned calculations with a two slide limit and a strict 10 minute limit including presentation and discussion.

Session One: 1:00pm - 2:15pm Current Computational Projects

  1. Ma-FE on Cobalt - Shuo Ma
  2. SORD at TACC and ALCF - Geoff Ely
  3. Hanging Wall Problem for NGA-W - Sandarsh Kumar/Rob Graves
  4. Parallel Broadband - Gaurang Mehta/Mats Rynge
  5. Chino Hills Higher Frequency - Ricardo Taborda/Jacobo Bielak
  6. So. California SI Inversion - En-Jui Lee/Po Chen
  7. Broadband CyberShake - Scott Callaghan
  8. AWP-ODC-SGT and AWP-ODC-GPU - Jun Zhou
  9. UCERF3 "Grand" Inversion: A Distributed Simulated Annealing Approach - Kevin Milner

Session Two: 2:15pm - 3:30pm: Future Computational Projects

  1. CyberShake 3.0 Map - Philip Maechling
  2. NGA-E Broadband - TBD
  3. UCVM Development - Brad Aagaard
  4. Extended Earthquake Rupture Forecast Development - Steve Day
  5. Impact of small-scale CVM heterogeneity on Ground Motion Sims - Kim Olsen
  6. Earthquake Simulators - James H. Dieterich
  7. DOE Science Centers - Yifeng Cui
  8. NSF Earth Cube - TBD
  9. NSF Geoinformatics - TBD

SCEC Meeting Times

We recognize that the CME meeting times overlap with related SCEC workshops listed here: [1]. Several CME group members want to participate in both meetings. To support these collaborative meetings, we will keep the CME meeting informal so that CME participants can move freely moving between meetings. We will try to keep the CME meeting on schedule so that you can determine when specific topics will be discussed at the CME meeting.

CME-related 2011 Meeting Posters

CME-related 2010 Meeting Posters

CME-related Web Sites